Negotiable
The date of payment from buyers deliver within days
Shandong
Long-term effective
2017-12-05 17:18
262
Company Profile
Qingdao Showhoo Steel Structure Co.,LtdBy certification [File Integrity]
Contact: shuohao(Mr.)
Email:
Telephone:
Phone:
Area: Shandong
Address: Shandong
Website: http://www.showhoosteelstructure.com/ http://shuohao.huabang-china.com/
Steel structure building
Prefab light steel frame structure industrial sheds design metal warehouse buildings
Why choose prefab steel structure warehouse building?
Prefab steel structure warehouse building is durable & easy maintenance. The careful and precise design makes itstand up to harsh climate, also with a life span of more than 50years under normal maintenance.The metal warehouse building is composed by H type steel, Z type steel, C type purlin, sandwich panel or corrugated steel sheet, and bolts, all components are manufactured in factory, so it has short construction period, you just do a simple installation in site, which will greatly lessen the construction time. EG: a 4000sqm warehouse can be finished during 30 days, just 1/4 time of the same concrete building.
Prefab steel warehouse building details:
Prefab light steel structure shed and warehouse building are a popular commercial and industrial building for storage of goods, or could be as production workshop all over the world. The larger the area for the steel warehouse building, the lower cost it will be. It also could be customized according to client’s requirement.
Prefab light steel warehouse building is also often widely used as steel hangar, steel building kit, workshop, shed, poultry farm, chicken shed, office, metal building, exhibition hall, etc.
Prefab steel warehouse building type:
Prefab steel warehouse building including single slope, double slopes, single span, multi-span, with overhead crane, without overhead crane.
Main Market:
Australia, Philippines, Benin, Ethiopia, Mauritius, Papua New Guinea, Sudan, UAE, South America, South Africa, etc
Material List:
Main Parts |
Item Name |
Specification |
Main Steel Frame |
Steel Column |
Q235B, Q345B H shape, Box, Steel pipe, Hot rolled sheet |
Steel Beam |
Q235B, Q345B H shape, Steel Truss, Hot rolled sheet |
|
Supporting System |
Brace |
Q235B, Q345B Steel rod, Steel pipe, Angle steel |
Roof Purlin |
C or Z shape, Steel purlin | |
Wall Purlin |
Q235B, Q345B C or Z shape, Steel purlin |
|
Roof |
Single colorful corrugate steel sheet, Sandwich panel with EPS,Rock wool, PU, Glass wool etc., | |
Wall |
Single colorful corrugate steel sheet, Sandwich panel with EPS,Rock wool, PU, Glass wool etc., | |
Accessories |
Bolts |
Ordinary, High strength |
Gutter |
Galvanized Steel plate, Stainless steel | |
Windows |
Aluminum alloy-Glass, Aluminum alloy-shutter, PVC | |
Doors |
Sliding or Rolling door | |
Downpipes |
PVC pipe, Color steel pipe | |
Edge Cover |
Made of color steel sheet thickness 0.5mm | |
Ventilator |
Stainless steel | |
Crane |
Crane in 5 tons to 20 tons |
FAQ:
1. How to guaranteeour quality?
We have strict quality control department. We support BV, SGS and other testing before loading. Your visit to our factory will be warmly welcome.
2. How about the delivery time?
After we get your deposit, we will make the drawing and send you to confirm soon. Usually it is 15 days to 45 days after we get your deposit.
3. How about the installation?
We will send you a detailed installation drawing and a simple installation video before you start the installation.
If you need, we also could arrange the engineer to guide the installation, just you have to bear the ticket, meat and living, visa, wages, etc
We also could arrange the worker team to help you to install.
4. How about our quotation?
Because we are factory, we could give you the competitive price. If you have drawing, we also could make according to your drawing. If you don’t have drawing, we could design it for you.
5. The factor which affect the price?
It mainly depends on the climate of your location. Such as, if the wind speed is strong, the steel quantity will be more, it will add the cost. If your project is near from the sea, we suggest you use hot galvanized steel structure, it will have better corrosion resistance.
http://www.showhoosteelstructure.com/